Steel Flanges Oil Industry Used Round Shape Steel Forged Flanges quality is assured
Overview
Essential details
- Place of Origin:
-
Shandong, China
- Brand Name:
-
TOBO
- Model Number:
-
Forged Steel Socket Weld Flange
- Standard:
-
ANSI, bs, DIN, GB, ISO, JIS, Jpi, ASME, ASTM
- Product name:
-
Forged Steel Flange
- Material:
-
Stainless Steel 304/316/304L/316L
- Type:
-
Round Flange
- Application:
-
Industrial
- Pressure:
-
Class150/300/600/9001500/2500
- Size:
-
Customized Size
- Process:
-
Forging+machining+heating Treatment
- MOQ:
-
1 Ton
- Surface treatment:
-
Cnc Machined
Supply Ability
- Supply Ability
- 1000 Ton/Tons per Month
Packaging & delivery
- Packaging Details
- standard export packaging, suitable for all kinds of transportation, or as required
- Port
- Tianjin Qingdao Shanghai
- Picture Example:
-
- Lead time:
-
Quantity(tons) | 1 - 1 | 2 - 100 | 101 - 200 | >200 |
Lead time (days) | 7 | 10 | 14 | To be negotiated |
-
-
Our Advantages
WHY CHOOSE US
TEAM
More than 120 top-class mills
EQUIPMENT
A number of advanced equipments
QUALITY
Company with a variety of detection devices
FACTORY
We have five branch factories
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.
FAQ
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Packaging&Shipping
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.