
Add to Cart
Plate Flange Pipe Fittings Carbon Steel Stainless Steel Forged Din 1500LB 2'' 304/316 Stainless Pipe Fitting Forged
Product Name | 32750 blind flange |
Standard | ASME/ANSI B16.5/16.36/16.47A/16.47B, MSS S44, ISO70051, JISB2220, BS1560-3.1, API7S-15, API7S-43, API605, EN1092 |
Materials | Stainless steel:ASTM/ASMES/A182F304 | F304L |F304H | F316 | F316L | F321 | F321H | F347|316Ti | 309S |310S | 405 |409|410 | 410S | 416 | 420 | 430 | 630 | 660 | 254SMO | 253MA | 353MA Nickel Alloy: ASTM/ASME S/B366 UNS N08020| N04400|N06600| N06625| N08800| N08810|N08825| N10276|N10665|N10675|Incoloy 800 | Incoloy 800H | Incoloy 800HT | Incoloy 825 | Incoloy 901 | Incoloy 925 | Incoloy 926, Inconel 600 | Inconel 601 | Inconel 625 | Inconel 706 | Inconel 718 | Inconel X-750, Monel 400 | Monel 401 | Monel R 405 | Monel K 500 Hastelloy:HastelloyB | HastelloyB-2 | HastelloyB-3 | HastelloyC-4 | Hastelloy C-22 | Hastelloy C-276 | Hastelloy X |Hastelloy G | Hastelloy G3 Ti alloy:ASTM R50250/GR.1 | R50400/GR.2 | R50550/GR.3 | R50700/GR.4 | GR.6 |R52400/GR.7 | R53400/GR.12 | R56320/GR.9 |R56400/GR.5 Carbon steel: A234 WPB | A420 WPL6 |
Marking | Supply Logo + Standard + Size(mm) + HEAT NO +or as your requirement |
Test | Chemical Component Analysis, Mechanical Properties, Metallurgical Analysis, Impact Testing, Hardness testing , Ferrite Testing, Intergranular corrosion testing, X-ray Inspection (RT), PMI, PT, UT, HIC & SSC test, etc. or as your requirment |
Certificates | API, ISO, SGS, BV, CE, PED, KOC, CCRC, PDO, CH2M HILL and etc. |
Applications | Ø EN 1.4835 has good weldability and can be welded using the following methods: 1. Shielded metal arc welding (SMAW)
2. Gas tungsten arc welding, GTAW (TIG)
3. Plasma arc welding (PAW)
4. Gas metal arc GMAW (MIG)
5. Submerged-arc welding (SAW) Ø Typical application areas for 1.4835: 1. Ovens 2. Construction 3. Building 4. As details at high temperature |
Advantages | ü Welding ü Machining |
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.