
Add to Cart
China Hot Butting Welding Elbow Stainless Steel 45 degree Elbows Forged High Pressure Pipe Fittings Ss304/316
In piping systems, elbows are pipe fittings that change the direction of the piping. According to the Angle points, there are 45° and 90°180°, the three most commonly used, in addition, according to the engineering needs also include 60° and other abnormal Elbow.
Product name | Socket Welding Elbow | |
Size | 1/2"-2 4" ,DN15-DN600 24"-72",DN600-DN1800 | |
Material | ASTM | Carbon steel: (ASTM A234WPB,,A234WPC,A420WPL6. |
Stainless steel: (ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10 00Cr17Ni14Mo2, ect.) | ||
Alloy Steel: A234WP12,A234WP11,A234WP22,A234WP5,A420WPL6,A420WPL3 | ||
DIN | Carbon steel: St37.0,St35.8,St45.8 | |
Stainless steel: 1.4301,1.4306,1.4401,1.4571 | ||
Alloy steel: 1.7335,1.7380,1.0488(1.0566) | ||
JIS | Carbon steel: PG370,PT410 | |
Stainless stee: SUS304,SUS304L,SUS316,SUS316L,SUS321 | ||
Alloy steel: PA22,PA23,PA24,PA25,PL380 | ||
GB | 10#,20#,20G,23g,20R,Q235,16Mn, 16MnR,1Cr5Mo,12CrMo, 12CrMoG, 12Cr1Mo | |
Standard | ASME,ANSI B16.9; DIN2605,2615,2616,2617,JIS B2311 ,2312,2313; EN 10253-1 ,EN 10253-2 | |
Application | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, water and nuclear power | |
Pressure | Sch5--Sch160,XXS | |
Shape | Equal, round | |
Technics | Forged | |
Type | LR/SR 30,45,60,90,180 degree | |
1.0D, 1.5D, 2.0D, 2.5D, 3D,4D,5D,6D,7D-40D. |
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.